Accelerate EVT by 4–6 Weeks — No Manual Routing Required

Full board in under 4 hours. No layout tools required — just upload your schematic. Accelerate EVT cycles without blocking DVT prep.

Why Robotics Teams Lose Weeks 

Board bring-up delays stall integration and validation testing. For robotics VPs and engineering leads, every board delay threatens your demo, your deadline, or your budget.

Layout bottlenecks stall iteration

One respin can cost 6 weeks and $20K (industry avg. respin: 4–6 weeks)

Low first-pass yield risks rework

Missed specs mean blown buffers and all-hands triage

Engineers stuck doing layout

Expensive engineers on low-leverage work instead of running bring-up or closing EVT

Outsourced layout slows cycles

Coordination overhead kills momentum

Compliance burdens drag down speed

"We need traceability on every ECO"

What Quilter Automates — and Why It Matters for You

Physics-first automation means Quilter doesn’t guess; it compiles the optimal board every time.

What slows you down

How Quilter solves it

Measurable impact

Layout bottlenecks stall iteration

Fully automated placement and routing

Typical jobs return a fully routed candidate in ≈ 4 hours; complex boards can take up to 24 hours.

Low first-pass yield risks rework

Physics Rule Checks + constraint-driven design

80% fewer re-spins — ensures DRC/DFM compliance

Engineers stuck doing layout

No manual routing required — any engineer can use

40% more engineering time redirected for routine low-complexity boards (avg. 10+ hrs/week)

Outsourced layout slows cycles

Infinite design capacity in-house

Zero coordination delays

Compliance burdens drag down speed

Fabrication-ready outputs and audit-friendly docs

Traceable outputs for ECO and DFM reviews — ISO/ITAR ready

EMI/EMC failures from bad routing

Deterministic AI respects trace spacing and converter placement — supports EMI-aware spacing and converter placement

Reduces compliance failures, improves FPY

Harness fit and test connector issues

Engineers can lock connector locations for exact harness alignment

Avoids layout changes late in bring-up

Built for Speed, Built to Ship — What Engineering Leaders Unlock

VP Engineering sees higher iteration throughput, lower failure risk, and stronger demo readiness.

4× faster EVT turns

Compress board bring-up from 4 weeks to under 1 day

80% fewer re-spins

Physics-driven design improves first-pass yield

40% increase in engineering throughput

Teams focus on integration and testing (FTE savings: 0.5+ engineer/project)

$20K saved per avoided respin

According to industry research

Eliminate the Bottleneck. Keep the Momentum.

The fastest teams already made the switch — don’t let delays define your roadmap.

Get started