Eliminate re-spins and compress layout time from 6 weeks to 1 day — even for 30+ layer, high-pin-count boards.
If you lead R&D in aerospace, semiconductors, or embedded systems, you’ve likely seen mission-critical projects blocked by layout constraints.
Senior engineers often spend 4–6 weeks on 18–30 layer layouts
Traditional tools can't manage dense grids or differential pairs
One missed stub or skew undermines first-pass success
Errors surface late during integration and delay validation
Quilter is built for high-stakes backplanes — not everyday routing. It delivers complete, constraint-driven layouts where autorouters break down.
What slows you down
How Quilter solves it
Measurable impact
Weeks of hand-routing
Full-stack layout automation with constraint adherence
Layout time cut from 6 weeks to <24 hrs
Autorouter failure
Physics-driven routing with deterministic pathing
100% net completion with zero cleanup
Signal integrity risks
Built-in impedance, skew, and stub checks; clean routing around CAD-defined keep-outs
-80% SI-related re-spins
Bring-up surprises
Manufacturable outputs verified via physics simulation
Dramatic increase in first-pass success
High-stakes re-spins
Fabrication-ready, validated outputs
Save $20K+ per avoided re-spin — fast adaptation to updated netlists without duplicating prior effort
Semiconductor and embedded systems teams using Quilter avoid layout bottlenecks and reclaim weeks of critical development time.
5x faster layout
From 30+ days to under 24 hours
80% fewer re-spins
Constraint checks reduce layout errors
$20K+ saved per board
Avoided backplane rework costs
100% connector accuracy
Every pin routed exactly to spec — deterministic AI eliminates missed nets and manual rework