Never Miss a Qual Window Again—Get Layouts in Hours

Physics-driven AI delivers constraint-abiding designs without manual routing or EDA tool overhead—purpose-built for precision test boards layout teams don’t have time for.

Why Test Boards Block Innovation

Environmental test boards aren’t just tedious—they’re time bombs. When layout delays push testing into the final stretch, teams don’t have time to fix what they find. Late discovery means a failed qual, a missed compliance gate, or a schedule slip nobody can absorb.

Late discovery derails qual

Teams get critical boards too late to fix what they find before deadlines

Missed test windows

One bad layout can derail qualification and delay compliance

Test fixture flaws cause false failures

Poor layout can invalidate test results

Autorouters can’t be trusted

Route through power regions, break impedance, or need hand-holding

How Quilter Eliminates the Test Board Bottleneck

Quilter ensures your team discovers problems early—when there's still time to fix them. Quilter outputs first-pass-valid designs through physics-driven, constraint-bound automation.

What slows you down

How Quilter solves it

Measurable impact

Bottlenecked by manual routing

Full-board AI placement + routing

First candidates in < 1 hr; full job typically completes within hours

Repetitive grunt work

Constraint reuse + schematic parsing

80% less layout effort

Autorouters can’t be trusted

Physics Rule Checks + deterministic routing

0 PRC violations at output

Missed test windows

Rule-constrained, first-spin outputs

Enables earlier validation—reduces risk of late discovery during qual

Error-prone constraint setup

Auto-imports prior constraints for layout alignment

Prevents re-entry mistakes and speeds setup

What Your R&D Team Gains When Layout Stops Being the Bottleneck

Quilter gives engineering teams time back, reduces error risk, and helps critical tests happen on schedule.

80% less layout effort

Engineers prioritize high-impact boards

90% fewer re-spins

Validation stays on schedule

<4 hr turnarounds

Schematic upload to fab-ready file

2–3 weeks saved on bring-up

Layout no longer the bottleneck

Free Your Engineers to Focus on Innovation, Not Layout.

The fastest teams already made the switch—don’t be the last stuck hand-routing environmental test boards.

Get started